Healthcare and institutional architecture

Plan the program, test the space, and keep each decision connected.

Arrange is a local-first planning workspace that connects room programs, reference criteria, spatial studies, engineering intent, coordination, and project outputs in one project record.

One project record

A room carries its context into the next decision.

A project organizes departments, functional areas, rooms, and equipment. Room criteria, quantities, finishes, utilities, notes, and decisions stay together so planning and coordination can read the same source.

01

Build the program

Start with VA space planning criteria where they apply, or create custom departments, rooms, templates, and equipment. Import and review program spreadsheets as the work develops.

02

Study relationships and layout

Describe adjacencies and separation intent, place rooms in a Block Plan, trace circulation, and compare alternatives in 2D or 3D before production modeling.

03

Carry criteria into coordination

Use room data for engineering calculations, finishes, schedules, tasks, reports, and model checks. The optional local pyRevit bridge exchanges selected information with the open Revit model.

Project ownership

The project file stays in your hands.

Arrange runs in the browser. A local .arrange.json file is the source of truth for a local project; you can also choose a shared file or a Live Project URL. Arrange does not keep a separate project database. The optional Revit bridge runs on the same workstation, and Revit remains responsible for the model and its final Sync with Central.

Arrange supports early planning and coordination. It does not replace the architect’s design judgment, a construction model, or project-specific code and standards review.

ReadApplication guidance and case studies ExploreHow the adjacency graph developed UseIFC model checker